Prefab Building Installation for Maintenance Area, Electrical Room, Stairs, and Railings
Prefab Building Installation for Maintenance Area, Electrical Room, Stairs, and Railings
Prefab Building Installation for Maintenance Area, Electrical Room, Stairs, and Railings
VARD VUNG TAU FACTORY
KCN Đông Xuyên - Rạch Dừa - TP Vũng Tàu - BRVT

COMPLETED PROJECT – OCTOBER 2023
PRE-FABRICATED BUILDING INSTALLATION – VARD VUNG TAU FACTORY
HP Blast & Paint was honored to carry out the steel structure pre-fabricated building installation for Ban Thach Construction Company at the VARD Vung Tau LTD Factory, Dong Xuyen Industrial Park, Vung Tau. The construction work included:

• Pre-fabricated building for the maintenance area
• Electrical room installation
• Stairs and railings

COMPLETED PROJECT – OCTOBER 2023
PRE-FABRICATED BUILDING INSTALLATION – VARD VUNG TAU FACTORY
HP Blast & Paint was honored to carry out the steel structure pre-fabricated building installation for Ban Thach Construction Company at the VARD Vung Tau LTD Factory, Dong Xuyen Industrial Park, Vung Tau. The construction work included:

 

• Pre-fabricated building for the maintenance area
Electrical room installation
Stairs and railings

 

PROJECT IMAGES

Prefab Building Installation for Maintenance Area, Electrical Room, Stairs, and Railings-11-11

 

2-5

3

1